NLP250CJ Tech Specifications

COVER ASSY FOR NLP250 POWER SUPP

Product Attribute Attribute Value
Category Off-Board Power Supplies / Off-board Power Accessories
Manufacturer Artesyn Embedded Power
Factory Lead Time 3 Weeks
Factory Lead Time 16 Weeks
Part Status Active
Accessory Type Cover Assembly
Product Attribute Attribute Value
Part Status Active
RoHS Status ROHS3 Compliant
Pbfree Code yes
Published 2011
Moisture Sensitivity Level (MSL) 1 (Unlimited)
RoHS Status RoHS Compliant
View Similar

NLP250CJ Documents

Download datasheets and manufacturer documentation for NLP250CJ

  • Datasheets

Others include   "NLP25"   parts

The following parts include  'NLP25' 

Part # Manufacturer Category Availability
NLP25-7605 Astec America (Artesyn Embedded Technologies) AC DC Converters 2589
NLP25-7605J Astec America (Artesyn Embedded Technologies) AC DC Converters 0
NLP25-7607 Astec America (Artesyn Embedded Technologies) AC DC Converters 0
NLP25-7607J Astec America (Artesyn Embedded Technologies) AC DC Converters 2648
NLP25-7608 Astec America (Artesyn Embedded Technologies) AC DC Converters 0
NLP25-7608J Astec America (Artesyn Embedded Technologies) AC DC Converters 2610
NLP25-7612 Astec America (Artesyn Embedded Technologies) AC DC Converters 2711
NLP25-7612J Astec America (Artesyn Embedded Technologies) AC DC Converters 2519
NLP25-7617 Astec America (Artesyn Embedded Technologies) AC DC Converters 0
NLP25-7617J Astec America (Artesyn Embedded Technologies) AC DC Converters 2675

Customers also viewed

Payment Problem

The payment method can be chosen from the four methods shown below: TT in advance (bank transfer), Western Union, Credit card, PayPal.

Excellent Service

Professional Platform
Wide variety of products
Various payment methods
Original component only
Delivery at full speed
365 days quality assurance

Common Problem

If you have any questions, you can contact us quickly in the following ways:

Tel : 86-755-86374759

Email : [email protected]

Address : D1 6th floor,Lehui Center,Jihua Road 489 Longgang District, Shenzhen-518129, China

Shopping Guide

Shipping Delivery Period Packages will be arranged for delivery within 1-2 days from the date of all items arrive at our warehouse. In stock items can be shipped out within 24 hours. Delivery Time depends on Shipping Method and Delivery Destinations.
Shipping Rate Shipping rate is based on size, weight, destination of the package. Bonchip offers competitive shipping options through top carriers DHL, FedEx and UPS. We also offer shipping account services for customers who wish to be billed directly for shipping.
Shipping Methods
Shipping Tracking Once the components are delivered, the tracking number will be notified via email immediately. The tracking number also could be found in order history.
Returning Returning All returns should be made within 60 days of date of invoice and be accompanied by the original invoice number, certificate of guarantee card, parts picture and a brief explanation or test report of the reason for the return. Returns will not be accepted after 60 days. Returned merchandise must be in original packaging and in resalable condition. Parts returned due to customer error at time of quote or sale will not be accepted. Please contact customer service for a return authorization before return shipment.
Ordering How to Buy Online and offline orders both are available.
If you have any operation issue, please feel free to contact with our customer service.
Payment TT in advance (bank transfer), Western Union, Credit card, PayPal. Customer is responsible for shipping fee, bank charges, duties and taxes.
NLP250CJ brand manufacturers: Artesyn Embedded Power, Bonchip stock, NLP250CJ reference price. NLP250CJ parameters, NLP250CJ Datasheet PDF and pin diagram description download.You can use the NLP250CJ Pluggable Connectors, DSP Datesheet PDF, find NLP250CJ pin diagram and circuit diagram and usage method of function, NLP250CJ electronics tutorials.You can download from the Bonchip.
0