- All Products
- Cables Management
- Heat Shrink Tubing
-
DCPT-10/5-45-SP
In Stock
Min. : 1
Not available to buy on line? Want the lower wholesale price? Please sendRFQ, we will respond immediately
DCPT-10/5-45-SP Tech Specifications
Heat Shrink Tubing ST Polyolefin Yellow/Green Thin Spool
Product Attribute | Attribute Value |
---|---|
Category | Cables Management / Heat Shrink Tubing |
Manufacturer | TE Connectivity Raychem Cable Protection |
Factory Lead Time | 3 Weeks |
Factory Lead Time | 21 Weeks |
Mount | Cable |
Operating Temperature | -55°C~135°C |
Published | 2014 |
Feature | Flame Retardant, Fluid Resistant |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) |
Max Operating Temperature | 135°C |
Color | Green, Yellow |
Shrinkage Ratio | 2 to 1 |
Length | 492.1' 150.0m |
Diameter - Inner, Recovered | 0.197 (5.00mm) |
RoHS Status | RoHS Compliant |
Product Attribute | Attribute Value |
---|---|
Part Status | Active |
RoHS Status | ROHS3 Compliant |
Pbfree Code | yes |
Lifecycle Status | ACTIVE (Last Updated: 3 days ago) |
Material | Polyolefin (PO) |
Packaging | Spool |
Series | DCPT |
Part Status | Active |
Type | Tubing, Flexible |
Min Operating Temperature | -55°C |
ELV | Compliant |
Shrink Temperature | 95°C |
Diameter - Inner, Supplied | 0.394 (10.01mm) |
Recovered Wall Thickness | 0.025 0.64mm |
Lead Free | Lead Free |
DCPT-10/5-45-SP Documents
Download datasheets and manufacturer documentation for DCPT-10/5-45-SP
-
Datasheets
Others include "DCPT-" parts
The following parts include 'DCPT-'
Part # | Manufacturer | Category | Availability |
---|---|---|---|
DCPT-10/5-45-SP | Agastat Relays / TE Connectivity | Heat Shrink Tubing | 2515 |
DCPT-12/4-45-SP | Agastat Relays / TE Connectivity | Heat Shrink Tubing | 2626 |
DCPT-12/4-45-SP | TE Connectivity Raychem Cable Protection | Heat Shrink Tubing | |
DCPT-12/6-45-SP | Agastat Relays / TE Connectivity | Heat Shrink Tubing | 2700 |
DCPT-12/6-45-SP | TE Connectivity Raychem Cable Protection | Heat Shrink Tubing | |
DCPT-18/6-45-SP | Agastat Relays / TE Connectivity | Heat Shrink Tubing | 0 |
DCPT-18/6-45-SP | TE Connectivity Raychem Cable Protection | Heat Shrink Tubing | |
DCPT-19/9-45-SP | Agastat Relays / TE Connectivity | Heat Shrink Tubing | 2 |
DCPT-19/9-45-SP | TE Connectivity Raychem Cable Protection | Heat Shrink Tubing | |
DCPT-26/13-45-SP | Agastat Relays / TE Connectivity | Heat Shrink Tubing | 2778 |
Customers also viewed
![1206J1K01P00DAR](https://pic.bonchip.com/images/dimg/knowlessyfer-1206j5000152mxr-8262.jpg?x-oss-process=style/Webp)
1206J1K01P00DAR
Knowles / Syfer
CAP CER 1206
![HQCEGA182KAT9A](https://pic.bonchip.com/images/dimg/avxcorporation-hqcema101jat6a-9206.jpg?x-oss-process=style/Webp)
HQCEGA182KAT9A
AVX Corporation
CAP CER 1800PF 2KV NP0 3838
![C1206C184K4JAC7800](https://pic.bonchip.com/images/dimg/kemet-c1206c104k5rac7800-3966.jpg?x-oss-process=style/Webp)
C1206C184K4JAC7800
KEMET
CAP CER 0.18UF 16V U2J 1206
![GRM1885C2A270JA01J](https://pic.bonchip.com/images/dimg/murataelectronics-grm188r71c393ka01d-3748.jpg?x-oss-process=style/Webp)
GRM1885C2A270JA01J
Murata Electronics
CAP CER 27PF 100V NP0 0603
![CBR06C319BAGAC](https://pic.bonchip.com/images/dimg/kemet-cbr06c808b5gac-6236.jpg?x-oss-process=style/Webp)
CBR06C319BAGAC
KEMET
CAP CER RF 3.1PF 250V +/-0.1 PF
![C06CF360K-9UN-X1T](https://pic.bonchip.com/images/category/Capacitors.png?x-oss-process=style/Webp)
C06CF360K-9UN-X1T
Dielectric Laboratories
CAP CER 0603
![WYO102KCMBF0KR](https://pic.bonchip.com/images/dimg/vishaybccomponents-wyo102mcmbrakr-8053.jpg?x-oss-process=style/Webp)
WYO102KCMBF0KR
Angstrohm / Vishay
CAP CER 1000PF 440VAC Y5U RADIAL
![C1206C333J1RECAUTO](https://pic.bonchip.com/images/dimg/kemet-c1206c104k5rac7800-3966.jpg?x-oss-process=style/Webp)
C1206C333J1RECAUTO
KEMET
CAP CER 1206 33NF 100V X7R 5%
![K332K20C0GH5UL2](https://pic.bonchip.com/images/dimg/vishaybccomponents-k104k15x7rf5tl2-6825.jpg?x-oss-process=style/Webp)
K332K20C0GH5UL2
Electro-Films (EFI) / Vishay
CAP CER 3300PF 100V C0G/NP0 RAD
![CL10B393KB8NNNC](https://pic.bonchip.com/images/dimg/samsungelectromechanics-cl03a473kp3nnnc-6357.jpg?x-oss-process=style/Webp)
CL10B393KB8NNNC
Samsung Electro-Mechanics America, Inc.
CAP CER 0.039UF 50V X7R 0603
Featured Manufacturers
Popular Categories
Memory Connectors...
Loupes & Magnifiers
Soldering Irons &...
Interface - I/O E...
Measurement Acces...
Voltage Supervisors
Latches & Locks
Single BJT Transi...
Markers
Circuit Protectio...
Terminals - Wire ...
DCPT-10/5-45-SP brand manufacturers: TE Connectivity Raychem Cable Protection, Bonchip stock, DCPT-10/5-45-SP reference price. DCPT-10/5-45-SP parameters, DCPT-10/5-45-SP Datasheet PDF and pin diagram description download.You can use the DCPT-10/5-45-SP Pluggable Connectors, DSP Datesheet PDF, find DCPT-10/5-45-SP pin diagram and circuit diagram and usage method of function, DCPT-10/5-45-SP electronics tutorials.You can download from the Bonchip.
Payment Problem
The payment method can be chosen from the four methods shown below: TT in advance (bank transfer), Western Union, Credit card, PayPal.
![](/front/images/VISA.jpeg)
![](/front/images/Master-card.jpeg)
Excellent Service
Professional Platform
Wide variety of products
Various payment methods
Original component only
Delivery at full speed
365 days quality assurance
Common Problem
If you have any questions, you can contact us quickly in the following ways:
Address : D1 6th floor,Lehui Center,Jihua Road 489 Longgang District, Shenzhen-518129, China
Shopping Guide
Shipping | Delivery Period | Packages will be arranged for delivery within 1-2 days from the date of all items arrive at our warehouse. In stock items can be shipped out within 24 hours. Delivery Time depends on Shipping Method and Delivery Destinations. |
Shipping Rate | Shipping rate is based on size, weight, destination of the package. Bonchip offers competitive shipping options through top carriers DHL, FedEx and UPS. We also offer shipping account services for customers who wish to be billed directly for shipping. | |
Shipping Methods |
![]() ![]() ![]() ![]() |
|
Shipping Tracking | Once the components are delivered, the tracking number will be notified via email immediately. The tracking number also could be found in order history. | |
Returning | Returning | All returns should be made within 60 days of date of invoice and be accompanied by the original invoice number, certificate of guarantee card, parts picture and a brief explanation or test report of the reason for the return. Returns will not be accepted after 60 days. Returned merchandise must be in original packaging and in resalable condition. Parts returned due to customer error at time of quote or sale will not be accepted. Please contact customer service for a return authorization before return shipment. |
Ordering | How to Buy | Online and offline orders both are available. If you have any operation issue, please feel free to contact with our customer service. |
Payment | TT in advance (bank transfer), Western Union, Credit card, PayPal. Customer is responsible for shipping fee, bank charges, duties and taxes. |